{
  "url": "frasheskiconstruction.com/faq/how-long-does-it-take-to-install-recessed-lighting-in-a-kitchen-in-berkeley",
  "name": "How long does it take to install recessed lighting in a kitchen in Berkeley?",
  "@type": "FAQPage",
  "@context": "https://schema.org",
  "speakable": {
    "@type": "SpeakableSpecification",
    "cssSelector": [
      "h1",
      ".faq-question",
      ".faq-answer",
      "[itemprop=\"acceptedAnswer\"]"
    ]
  },
  "mainEntity": [
    {
      "name": "How long does it take to install recessed lighting in a kitchen in Berkeley?",
      "@type": "Question",
      "acceptedAnswer": {
        "text": "The time it takes to install recessed lighting in a kitchen in Berkeley depends on several factors, including the number of lights, accessibility of the ceiling, and whether new wiring is required. A typical installation for a moderately sized kitchen might take one to three days. If existing drywall needs to be cut and repaired, it could extend the timeline.",
        "@type": "Answer",
        "description": "Installation typically takes 1-3 days, depending on the number of lights, ceiling accessibility, and wiring requirements."
      }
    }
  ],
  "description": "Installation typically takes 1-3 days, depending on the number of lights, ceiling accessibility, and wiring requirements."
}